République Tunisienne
Ministère de l'Enseignement Supérieur et de la Recherche Scientifique
Laboratoire génie mécanique
Acceuil
Habitations, thèses, mastères …Soutenances
Toutes les soutenances
Publications
Auteur princpal :
Co-Auteurs :
- IMEN BEL HADJ
- RIHAB BRAHMI
- Jean Yves Choley
- Moncef Hammadi
- Faida Mhenni
Titre :
NSGA-II algorithm for assembly plans optimization using the model-based systems engineering
Conférence :
Mois :
mars
Année :
2026
Journal, revue, page ... :
International Journal on Interactive Design and Manufacturing
Pays :
Ville :
Téléchargements :
Type de publication :
Article de Journal
Abstract :

Assembly Sequence Planning (ASP) is a critical stage in product development that strongly influences manufacturing performance. However, communication gaps between product designers and system engineers often lead to suboptimal assembly plans, as Computer-Aided Design (CAD)–based proposals may not fully align with Model-Based Systems Engineering (MBSE) requirements. To address this challenge, this study proposes a collaborative CAD–MBSE assembly planning optimization methodology that integrates both domains within a unified decision-making framework. This approach enables bidirectional information exchange between designers and system engineers, allowing geometric feasibility and system-level constraints to be jointly considered during assembly sequence generation. Furthermore, a multi-objective optimization process based on the Non-dominated Sorting Genetic Algorithm II (NSGA-II) is used to balance multiple assemblability indicators, enabling the identification of requirement-compliant assembly sequences. The effectiveness of the methodology is demonstrated through a vibration generator case study, which shows improved coordination between design and system models, enhanced assembly quality, and a reduction in the number of candidate sequences while maintaining compliance with design requirements. These results highlight the value of multi-criteria evaluation and collaborative decision-making in achieving efficient and consistent assembly planning outcomes.